Wednesday, August 31, 2011

Docklands all the way



DLR Canary Wharf



Originally derided as the “Toytown Railway” when it opened in 1987 from Canary Wharf to a slightly off centre City terminus at Tower Gateway, the Docklands Light Railway (DLR) has developed to become a serious contributor to the transport infrastructure in East London and a critical component in the transport infrastructure for next years Olympics 2012 in London. The reputation of the DLR was further damaged by unreliability which plagued it for the first 5 years but it has developed in robustness and capacity over the years and is a firm favourite with visitors and natives alike – as they say in East London – “Don’t be a knocker, be a Docker!”





DLR with the Dome in the background



This innovative, driverless railway serves parts of East and South East London. Commuters and tourists alike enjoy views of lesser-seen London locations from the easily accessible DLR. It connects with the Tube network at Bank and Tower Gateway (Tower Hill) stations and also at Shadwell, Stratford, Bow, Heron Quays, Canning Town and Canary Wharf. The DLR serves Beckton, Stratford and London City Airport to the East and North East and the Docklands, Greenwich and Lewisham to the South.









DLR Network - Diagramatic & geographic maps



Being a light railway many of the routes use existing and often abandoned rail routes in East London which once served the huge Docks complexes which stretched for many miles along the River Thames. This has allowed cheaper, quicker construction with less planning issues and delays as part of the overall regeneration of an area which had experienced years of decline as the docks and associated industries closed.





DLR 3 car configuration



The Toytown Railway has comprehensively proved its detractors wrong as it extended its reach to London City Airport, Woolwich and Lewisham (taking in Greenwich) south of the river and Beckton and now Stratford International north of the river. Other capacity enhancements increasing the trains to 3 cars and connecting underground to the major Tube interchange at Bank Station have greatly increased the usefulness of the DLR network. Passengers for their part appreciate the easy access, automatic ticketing (integrated with TfL’s Oyster system) and the security from having onboard Train Captains. Kids and tourists alike love the fact that these are automatic driverless trains and there is always a rush to occupy the front row which gives a driver’s eye view of the route. This is particularly popular on the tunnel section from Bank where the trains emerge from the darkness and climb steeply on a viaduct which gives excellent views of Limehouse and the towers of Canary Wharf.







With just under a year to go to the London 2012 Paralympic Games the fully accessible Docklands Light Railway (DLR) Stratford International extension opened today (31 August), bringing this key link into the heart of the Olympic Park. This will also be the terminus for the “Olympic Javelin” which will ferry up to 25,000 people an hour to and from the Olympic Park. The journey time from St. Pancras in Central London to the Olympics will be only 7 minutes, an Olympic sprint indeed!



See; St. Pancras Reborn



http://daithaic.blogspot.com/2007/11/st-pancras-reborn.html




Spectators will get free use of public transport with their tickets to Olympic events but a separate Javelin pass may be issued to manage crowds. The project is a key part of the London 2012 Olympic and Paralympic transport network and will improve accessibility on London's transport network for people with restricted mobility. It was due to open in July 2010, however the extension is opening well ahead of the London 2012 Olympic and Paralympic Games.





System Map @ Elverson Road



The 3.7-mile (6km) expansion from Canning Town to Stratford International forms a key part of the London 2012 Olympic Games transport network. There are four new stations along the new route, which connects the Olympic Park to five arenas in east London. The four new stations are Stratford International, Stratford High Street, Abbey Road and Star Lane. This will be the last extension of the DLR system until the branch to Dagenham is completed in 2017.





Docklands integrated with the TfL transport network



The extension completes a £500m upgrade of the Docklands Light Railway, which Transport for London (TfL) says will improve capacity by 50%. Mayor of London Boris Johnson said: "This expansion of the DLR is a further demonstration of the improvements that the London 2012 Games are making to our city.” This work will be of permanent benefit for Londoners and all those travelling in the capital from here on in. It's fantastic news and another example of London's lasting legacy of playing host to such a momentous event."





DLR train interior



Director of transport for the Olympic Delivery Authority, Hugh Sumner, said: "The opening of the new DLR extension is the last piece in the jigsaw for major upgrades and improvements to networks serving the Olympic Park. We have worked closely with TfL to fund and deliver a much-improved service which will leave east London better connected after the Games."



The Olympic venues served by the DLR are;



• Olympic Park: a 2.5 km2 site that will form the centre stage for the Games. It features purpose-built and accessible facilities including the Aquatics Centre, Velodrome and Olympic Stadium.



• ExCeL: is London’s largest exhibition and conference centre. During the Olympic Games it will host the Weightlifting, Judo, Fencing, Taekwondo, Table Tennis, Wrestling and Boxing. During the Paralympics it will host Table Tennis, Judo, Wheelchair Fencing, Boccia, Powerlifiting and Volleyball (Sitting).



• Greenwich Park: covers 74 hectares and is part of the Maritime Greenwich World Heritage Site. During the Olympic Games it will host the Equestrian events and Modern Pentathlon. During the Paralympic Games it will host the Equestrian Dressage.



• Royal Artillery Barracks: is owned and operated by the Ministry of Defence and will have a temporary venue beside Woolwich Common to host the Olympic Shooting event and the Paralympic Archery and Shooting events.






Stratford station in December 2009, showing the new DLR line and platforms under construction, this was formerly the North London Line platforms. The Olympic Park and Westfield Shopping Centre site is in the background.



The Docklands Light Railway is an automated light metro or light rail system opened on 31 August 1987 to serve the redeveloped Docklands area of London. It covers several areas of London, reaching north to Stratford, south to Lewisham, and west to Tower Gateway and Bank in the City of London financial district, and east to Beckton, London City Airport and Woolwich Arsenal.









Stratford International DLR Station



The DLR is now 23 miles (37 km) long, with 44 stations along the route. There are five branches: to Lewisham in the south, to Stratford in the north, to Beckton and to Woolwich Arsenal in the east, and to Central London in the west, splitting to serve Bank and Tower Gateway. Although the layout allows many different combinations of routes, at present the following four are operated in normal service:



• Stratford to Lewisham

• Bank to Lewisham

• Bank to Woolwich Arsenal

• Tower Gateway to Beckton




There is an additional shuttle service from Canning Town to Prince Regent, operated when exhibitions are in progress at the ExCeL exhibition centre, to double the normal service. These trains reverse direction in the eastbound platform at Canning Town and on a crossover at the high point where the line crosses the Connaught Crossing road bridge between Prince Regent and Royal Albert stations.







Making transport accessible to all is important in London and has an added impetus for the Paralympic Games in 2012. All DLR stations have lift or ramp access to the platforms, with level access onto the trains. All lifts have alarms enabled, which allow you to talk directly with a member of DLR staff should you experience any problems. Platforms are as level with trains as possible for easy access. The gap between the platform edge and the train is approximately 7.5cm wide and the step up/down from the platform to the train approximately 5cm high. Most wheelchair users find boarding/alighting smoothest with the largest wheel first – this may mean reversing as appropriate.







Elsewhere on the TfL transport network all of London's 8,500 buses are fully accessible, all 22,000 taxis have wheelchair ramps and all stations and trains on the DLR network are fully accessible. 62 Tube stations are now step-free from street to platform, and this will rise further with the imminent completion of works at Green Park, which will be a key step-free station during the Games. By the time of the 2012 Games 65 Tube stations will be step-free.



The DLR runs from 5.30am to 12.30am Monday to Saturday and from 7am to 11.30pm on Sunday. Fares are the same as those on the Tube and Oyster and Travelcard holders can use the DLR.



The Opening Ceremony of the Olympic Games will take place on 27 July 2012 and the Closing Ceremony on the 12 Aug 2012. 18 days later, the Paralympic Games (the second largest event of its kind in the world) will stage its Opening Ceremony. Odds are that many attending the ceremonies and events of London 2012 will be travelling on the Docklands Railway.







Docklands Light Railway website;



www.dlr.co.uk



See also;



London Olympics 2012 – Stratford Station



http://daithaic.blogspot.com/2009/01/london-olympics-2012-stratford-station.html



Paralympic Games



http://daithaic.blogspot.com/2008/09/paralympic-games.html






Docklands all the way



DLR Canary Wharf



Originally derided as the “Toytown Railway” when it opened in 1987 from Canary Wharf to a slightly off centre City terminus at Tower Gateway, the Docklands Light Railway (DLR) has developed to become a serious contributor to the transport infrastructure in East London and a critical component in the transport infrastructure for next years Olympics 2012 in London. The reputation of the DLR was further damaged by unreliability which plagued it for the first 5 years but it has developed in robustness and capacity over the years and is a firm favourite with visitors and natives alike – as they say in East London – “Don’t be a knocker, be a Docker!”





DLR with the Dome in the background



This innovative, driverless railway serves parts of East and South East London. Commuters and tourists alike enjoy views of lesser-seen London locations from the easily accessible DLR. It connects with the Tube network at Bank and Tower Gateway (Tower Hill) stations and also at Shadwell, Stratford, Bow, Heron Quays, Canning Town and Canary Wharf. The DLR serves Beckton, Stratford and London City Airport to the East and North East and the Docklands, Greenwich and Lewisham to the South.









DLR Network - Diagramatic & geographic maps



Being a light railway many of the routes use existing and often abandoned rail routes in East London which once served the huge Docks complexes which stretched for many miles along the River Thames. This has allowed cheaper, quicker construction with less planning issues and delays as part of the overall regeneration of an area which had experienced years of decline as the docks and associated industries closed.





DLR 3 car configuration



The Toytown Railway has comprehensively proved its detractors wrong as it extended its reach to London City Airport, Woolwich and Lewisham (taking in Greenwich) south of the river and Beckton and now Stratford International north of the river. Other capacity enhancements increasing the trains to 3 cars and connecting underground to the major Tube interchange at Bank Station have greatly increased the usefulness of the DLR network. Passengers for their part appreciate the easy access, automatic ticketing (integrated with TfL’s Oyster system) and the security from having onboard Train Captains. Kids and tourists alike love the fact that these are automatic driverless trains and there is always a rush to occupy the front row which gives a driver’s eye view of the route. This is particularly popular on the tunnel section from Bank where the trains emerge from the darkness and climb steeply on a viaduct which gives excellent views of Limehouse and the towers of Canary Wharf.







With just under a year to go to the London 2012 Paralympic Games the fully accessible Docklands Light Railway (DLR) Stratford International extension opened today (31 August), bringing this key link into the heart of the Olympic Park. This will also be the terminus for the “Olympic Javelin” which will ferry up to 25,000 people an hour to and from the Olympic Park. The journey time from St. Pancras in Central London to the Olympics will be only 7 minutes, an Olympic sprint indeed!



See; St. Pancras Reborn



http://daithaic.blogspot.com/2007/11/st-pancras-reborn.html




Spectators will get free use of public transport with their tickets to Olympic events but a separate Javelin pass may be issued to manage crowds. The project is a key part of the London 2012 Olympic and Paralympic transport network and will improve accessibility on London's transport network for people with restricted mobility. It was due to open in July 2010, however the extension is opening well ahead of the London 2012 Olympic and Paralympic Games.





System Map @ Elverson Road



The 3.7-mile (6km) expansion from Canning Town to Stratford International forms a key part of the London 2012 Olympic Games transport network. There are four new stations along the new route, which connects the Olympic Park to five arenas in east London. The four new stations are Stratford International, Stratford High Street, Abbey Road and Star Lane. This will be the last extension of the DLR system until the branch to Dagenham is completed in 2017.





Docklands integrated with the TfL transport network



The extension completes a £500m upgrade of the Docklands Light Railway, which Transport for London (TfL) says will improve capacity by 50%. Mayor of London Boris Johnson said: "This expansion of the DLR is a further demonstration of the improvements that the London 2012 Games are making to our city.” This work will be of permanent benefit for Londoners and all those travelling in the capital from here on in. It's fantastic news and another example of London's lasting legacy of playing host to such a momentous event."





DLR train interior



Director of transport for the Olympic Delivery Authority, Hugh Sumner, said: "The opening of the new DLR extension is the last piece in the jigsaw for major upgrades and improvements to networks serving the Olympic Park. We have worked closely with TfL to fund and deliver a much-improved service which will leave east London better connected after the Games."



The Olympic venues served by the DLR are;



• Olympic Park: a 2.5 km2 site that will form the centre stage for the Games. It features purpose-built and accessible facilities including the Aquatics Centre, Velodrome and Olympic Stadium.



• ExCeL: is London’s largest exhibition and conference centre. During the Olympic Games it will host the Weightlifting, Judo, Fencing, Taekwondo, Table Tennis, Wrestling and Boxing. During the Paralympics it will host Table Tennis, Judo, Wheelchair Fencing, Boccia, Powerlifiting and Volleyball (Sitting).



• Greenwich Park: covers 74 hectares and is part of the Maritime Greenwich World Heritage Site. During the Olympic Games it will host the Equestrian events and Modern Pentathlon. During the Paralympic Games it will host the Equestrian Dressage.



• Royal Artillery Barracks: is owned and operated by the Ministry of Defence and will have a temporary venue beside Woolwich Common to host the Olympic Shooting event and the Paralympic Archery and Shooting events.






Stratford station in December 2009, showing the new DLR line and platforms under construction, this was formerly the North London Line platforms. The Olympic Park and Westfield Shopping Centre site is in the background.



The Docklands Light Railway is an automated light metro or light rail system opened on 31 August 1987 to serve the redeveloped Docklands area of London. It covers several areas of London, reaching north to Stratford, south to Lewisham, and west to Tower Gateway and Bank in the City of London financial district, and east to Beckton, London City Airport and Woolwich Arsenal.









Stratford International DLR Station



The DLR is now 23 miles (37 km) long, with 44 stations along the route. There are five branches: to Lewisham in the south, to Stratford in the north, to Beckton and to Woolwich Arsenal in the east, and to Central London in the west, splitting to serve Bank and Tower Gateway. Although the layout allows many different combinations of routes, at present the following four are operated in normal service:



• Stratford to Lewisham

• Bank to Lewisham

• Bank to Woolwich Arsenal

• Tower Gateway to Beckton




There is an additional shuttle service from Canning Town to Prince Regent, operated when exhibitions are in progress at the ExCeL exhibition centre, to double the normal service. These trains reverse direction in the eastbound platform at Canning Town and on a crossover at the high point where the line crosses the Connaught Crossing road bridge between Prince Regent and Royal Albert stations.







Making transport accessible to all is important in London and has an added impetus for the Paralympic Games in 2012. All DLR stations have lift or ramp access to the platforms, with level access onto the trains. All lifts have alarms enabled, which allow you to talk directly with a member of DLR staff should you experience any problems. Platforms are as level with trains as possible for easy access. The gap between the platform edge and the train is approximately 7.5cm wide and the step up/down from the platform to the train approximately 5cm high. Most wheelchair users find boarding/alighting smoothest with the largest wheel first – this may mean reversing as appropriate.







Elsewhere on the TfL transport network all of London's 8,500 buses are fully accessible, all 22,000 taxis have wheelchair ramps and all stations and trains on the DLR network are fully accessible. 62 Tube stations are now step-free from street to platform, and this will rise further with the imminent completion of works at Green Park, which will be a key step-free station during the Games. By the time of the 2012 Games 65 Tube stations will be step-free.



The DLR runs from 5.30am to 12.30am Monday to Saturday and from 7am to 11.30pm on Sunday. Fares are the same as those on the Tube and Oyster and Travelcard holders can use the DLR.



The Opening Ceremony of the Olympic Games will take place on 27 July 2012 and the Closing Ceremony on the 12 Aug 2012. 18 days later, the Paralympic Games (the second largest event of its kind in the world) will stage its Opening Ceremony. Odds are that many attending the ceremonies and events of London 2012 will be travelling on the Docklands Railway.







Docklands Light Railway website;



www.dlr.co.uk



See also;



London Olympics 2012 – Stratford Station



http://daithaic.blogspot.com/2009/01/london-olympics-2012-stratford-station.html



Paralympic Games



http://daithaic.blogspot.com/2008/09/paralympic-games.html






Wednesday, January 21, 2009

London Olympics 2012 – Stratford Station



Stratford Station today



On the 6th July 2005 at 12.49 pm BST, it was announced to the world that the hosts of the 2012 Olympic Games would be.... London! Beating off close competition from Paris, Madrid, New York and Moscow, London had been awarded the largest event of its kind on earth. So in the first of an occasional series up to the Olympics this piece covers the regeneration of Stratford Station which along with Stratford International 400 metres away will form the lynchpin of the Olympic transport arrangements serving the Olympic Park and contributing to the regeneration of East London. More than this the hosting of the 2012 Olympics is a proud moment for London to display the diversity and dynamism it enjoys as a truly World City.







The Opening Ceremony of the Olympic Games will take place on 27 July 2012 and the Closing Ceremony on the 12 Aug 2012. 18 days later, the Paralympic Games (the second largest event of its kind in the world) will stage its Opening Ceremony.



See Paralympic Games;



http://daithaic.blogspot.com/2008/09/paralympic-games.html





The scene in Trafalgar Square London on 6th July 2005



The challenge was set by the Beijing 2008 Olympics which were widely perceived as highly successful but closer examination reveals some transport problems and solutions which would not be portable to an open city like London and an open society in modern Britain. Firstly the Olympic Park in Beijing was a huge concreted area of 12 K m² (what / who was there before?) without merchandising and catering leading to much criticism that the Park was an atmosphere free wasteland outside of the stadia and venues.





Beijing Metro with Line 8 serving Olympic venues



In addition the Olympic Park was served by Metro Line 8, a 3 station line which had only opened 18 days before the opening ceremony and whose uneven track wear revealed unacknowledged teething problems. Because the security arrangements were changed shortly before the games (due to bombings in Western China) all passengers had to disembark at the interchange station of Beitucheng, go through security and then re-enter the system leading to long delays. This meant many people didn’t get to the venues on time. One of the 3 stations on Line 8 was outside the Security Zone and could not be used and the final huge Olympic Sports Centre Stadium was distant from the venues in the Olympic Park and was lightly used. Also much of the inward crowd control was achieved by using lines of soldiers to form human corridors and that is not an option for London 2012.





Stratford Regional Upgrade



It is expected that during the Olympic Games, more than 7.7 million tickets will be sold during the 16 days of competition. This will allow spectators to watch nearly 11,000 athletes from over 200 nations compete in 26 sports at 300 different venues across the United Kingdom. In London, these venues fall into 3 zones:



The Olympic Park - this includes the main stadium and several smaller venues for the hockey, swimming, cycling etc



• The River Zone - this includes the ExCel Centre, O2 Arena and Greenwich Park



• The Central Zone - which includes Hyde Park, Regents Park and Horse Guards Parade




The Olympic Transport plan calls for 100% of ticketed spectators to travel to the 2012 Games by Public Transport or by walking or cycling. The vision for Olympic Transport in 2012 is for existing public transport services in London to be improved and enhanced in the years before 2012 and additional services will operate during the Games to meet the extra demand. It is estimated that these enhancements will mean a train arriving at the main Olympic Park every 15 seconds. Services due for improvement include:









2012 Stadium



• Docklands Light Railway - through the addition of an extra carriage (from 2 to 3 cars) on the entire fleet, which will also be increased, track extension to Woolwich Arsenal and service enhancements.



• North London Line - will become part of "London Overground" which will see new rolling stock as well as new terminating platforms at Stratford and an increase in services. In addition the extended East London Line will reopen in 2010.



See East London Line



http://daithaic.blogspot.com/2007/12/east-london-line.html



• Stratford International Station - the introduction of the "Javelin" service which will run from St Pancras International, through Stratford International, to Ebbsfleet - with a train arriving every 7 mins.



See St. Pancras Reborn;



http://daithaic.blogspot.com/2007/11/st-pancras-reborn.html



• LU initiatives - West Ham Station Upgrade, Stratford Regional Upgrade and 2012 Service Plan



• Olympic Route Network - As well as the transport enhancements undertaken, an Olympic Route Network (ORN) will be implemented, which will comprise a network of roads linking all competition and key non-competition venues to enable the Olympic Family members to travel quickly and securely between accommodation, competition venues, airports etc.






Stratford Station signage reflects the multi operator environment



Stratford Regional Station is a major public transport interchange that enables passengers from east of London to travel to Canary Wharf without travelling into central London. It also provides interchange opportunities for passengers using Underground services to or from central London. Stratford Regional Station has been identified as a gateway station for the Olympic Park.











Olympic Park - Model and Map of the site



Stratford Regional Station currently experiences occasional periods of passenger congestion. As well as the Games there are other sources of additional future demand at Stratford Regional Station. These include the underlying significant increase in demand to 2016 which was forecast in the Mayor's London Plan and the Stratford City Development (SCD) adjacent to the station. Stratford City is a project to create a major new mixed use urban centre in East London on the site of a former railway goods yard at Stratford. The project will cost £4 billion funded from both public and private sources. The site lies to the north of the existing Stratford town centre around Temple Mills. The development totals 13.5 million ft² (1,300,000 m²), including 5 million ft² (460,000 m²) of offices, 1.6 million ft² (150,000 m²) of retail and 4,850 new homes. The retail element will be anchored by three department stores and it is hoped that it will become the third most important retail centre in London after the West End and Knightsbridge shopping districts in the city centre. There will be a cluster of tall buildings including towers of 50 and 30 storeys designed by Richard Rogers.





Stratford City



A package of improvements to Stratford Regional Station is being implemented. These improvements will provide a long-term legacy benefit before the Games, as well as additional temporary measures to meet the specific needs of the Games. This package is part of a larger scheme which includes works related to the Stratford City Development and the proposed Docklands Light Railway extension to Stratford International Station.







The programme of works being developed includes the following elements:



• re-opening the eastern subway with new stairs to platforms 3/5 (westbound Central line and westbound mainline) and 6/8 (eastbound Central and eastbound mainline);

• an additional westbound platform for the Central Line;

• widening the eastern end of platforms 6/8,

• platform extensions and associated network works for platforms 10a, 11 and 12 (mainline);

• improved accessibility and connectivity to, and between, platforms through the provision of additional lifts and staircases;

• a new mezzanine structure to link the Jubilee Line with the proposed Town Centre Link bridge;

• upgraded station domestic power supplies, and increased station command and control facilities;

• de-cluttering of platforms 3/5 and 6/8; and

• a temporary footbridge on platform 6/8, if required.




In addition there are other planned or proposed works being developed by other parties:



Docklands Light Railway will construct two new platforms (12a and 12b) for use by the North London Line. The platforms will be connected to all subways, which will be extended. There will also be a connection between the central and eastern subways;





Stratford Regional - view from Stratford City side



Docklands Light Railway will convert the existing North London Line platforms (1 and 2) for use by the Docklands Light Railway on the Canning Town to Stratford International Station route;



Docklands Light Railway has also upgraded the existing mezzanine level platform to two terminating platforms (4a and 4b) for services to Poplar; and as part of the Stratford City Development a new Northern Ticket Hall will be constructed along with the Town Centre Link Bridge, (also known as the 'Living Bridge'), which will link Stratford town centre with the new Stratford City Development.



The planned works will increase the peak capacity of Stratford Regional Station for existing and new services. The infrastructure works will provide much needed additional capacity, but it will also be essential to develop robust operational plans for each of the modes in order to deliver these essential works.





Stratford Platforms



The transport arrangements for London 2012 will succeed or fail based on the success of the arrangements at Stratford Regional and Stratford International. By 2012 London Underground is expected to be supporting 4M daily passenger journeys (up from 3.3M at present) but during the Olympic period this will increase to 5M passenger journeys a day driven by the Olympic venues, workforce and the Olympic Events each day in Hyde and Victoria Parks which are expected to attract around 65,000 people each day. For Stratford it means handling 120,000 passengers during the 3 hour morning peak, up from 37,000 today. Of these 3 to 4% are expected to be mobility impaired and larger wider lifts will be designed to make access easier.



The London 2012 Olympic Challenge is a huge undertaking but for both the spectators and residents of London the first measure of success will be how well transport arrangements cope with the exceptional demand both of “normal life” and the Olympics, the all night running on the days of the opening and closing ceremonies and the late running to 2.30 am on other nights. How London copes with this exceptional demand whilst maintaining safety and security will be largely gauged from how well the crucial Stratford Hub works.





Aquatic Centre





London Olympics 2012 – Stratford Station



Stratford Station today



On the 6th July 2005 at 12.49 pm BST, it was announced to the world that the hosts of the 2012 Olympic Games would be.... London! Beating off close competition from Paris, Madrid, New York and Moscow, London had been awarded the largest event of its kind on earth. So in the first of an occasional series up to the Olympics this piece covers the regeneration of Stratford Station which along with Stratford International 400 metres away will form the lynchpin of the Olympic transport arrangements serving the Olympic Park and contributing to the regeneration of East London. More than this the hosting of the 2012 Olympics is a proud moment for London to display the diversity and dynamism it enjoys as a truly World City.







The Opening Ceremony of the Olympic Games will take place on 27 July 2012 and the Closing Ceremony on the 12 Aug 2012. 18 days later, the Paralympic Games (the second largest event of its kind in the world) will stage its Opening Ceremony.



See Paralympic Games;



http://daithaic.blogspot.com/2008/09/paralympic-games.html





The scene in Trafalgar Square London on 6th July 2005



The challenge was set by the Beijing 2008 Olympics which were widely perceived as highly successful but closer examination reveals some transport problems and solutions which would not be portable to an open city like London and an open society in modern Britain. Firstly the Olympic Park in Beijing was a huge concreted area of 12 K m² (what / who was there before?) without merchandising and catering leading to much criticism that the Park was an atmosphere free wasteland outside of the stadia and venues.





Beijing Metro with Line 8 serving Olympic venues



In addition the Olympic Park was served by Metro Line 8, a 3 station line which had only opened 18 days before the opening ceremony and whose uneven track wear revealed unacknowledged teething problems. Because the security arrangements were changed shortly before the games (due to bombings in Western China) all passengers had to disembark at the interchange station of Beitucheng, go through security and then re-enter the system leading to long delays. This meant many people didn’t get to the venues on time. One of the 3 stations on Line 8 was outside the Security Zone and could not be used and the final huge Olympic Sports Centre Stadium was distant from the venues in the Olympic Park and was lightly used. Also much of the inward crowd control was achieved by using lines of soldiers to form human corridors and that is not an option for London 2012.





Stratford Regional Upgrade



It is expected that during the Olympic Games, more than 7.7 million tickets will be sold during the 16 days of competition. This will allow spectators to watch nearly 11,000 athletes from over 200 nations compete in 26 sports at 300 different venues across the United Kingdom. In London, these venues fall into 3 zones:



The Olympic Park - this includes the main stadium and several smaller venues for the hockey, swimming, cycling etc



• The River Zone - this includes the ExCel Centre, O2 Arena and Greenwich Park



• The Central Zone - which includes Hyde Park, Regents Park and Horse Guards Parade




The Olympic Transport plan calls for 100% of ticketed spectators to travel to the 2012 Games by Public Transport or by walking or cycling. The vision for Olympic Transport in 2012 is for existing public transport services in London to be improved and enhanced in the years before 2012 and additional services will operate during the Games to meet the extra demand. It is estimated that these enhancements will mean a train arriving at the main Olympic Park every 15 seconds. Services due for improvement include:









2012 Stadium



• Docklands Light Railway - through the addition of an extra carriage (from 2 to 3 cars) on the entire fleet, which will also be increased, track extension to Woolwich Arsenal and service enhancements.



• North London Line - will become part of "London Overground" which will see new rolling stock as well as new terminating platforms at Stratford and an increase in services. In addition the extended East London Line will reopen in 2010.



See East London Line



http://daithaic.blogspot.com/2007/12/east-london-line.html



• Stratford International Station - the introduction of the "Javelin" service which will run from St Pancras International, through Stratford International, to Ebbsfleet - with a train arriving every 7 mins.



See St. Pancras Reborn;



http://daithaic.blogspot.com/2007/11/st-pancras-reborn.html



• LU initiatives - West Ham Station Upgrade, Stratford Regional Upgrade and 2012 Service Plan



• Olympic Route Network - As well as the transport enhancements undertaken, an Olympic Route Network (ORN) will be implemented, which will comprise a network of roads linking all competition and key non-competition venues to enable the Olympic Family members to travel quickly and securely between accommodation, competition venues, airports etc.






Stratford Station signage reflects the multi operator environment



Stratford Regional Station is a major public transport interchange that enables passengers from east of London to travel to Canary Wharf without travelling into central London. It also provides interchange opportunities for passengers using Underground services to or from central London. Stratford Regional Station has been identified as a gateway station for the Olympic Park.











Olympic Park - Model and Map of the site



Stratford Regional Station currently experiences occasional periods of passenger congestion. As well as the Games there are other sources of additional future demand at Stratford Regional Station. These include the underlying significant increase in demand to 2016 which was forecast in the Mayor's London Plan and the Stratford City Development (SCD) adjacent to the station. Stratford City is a project to create a major new mixed use urban centre in East London on the site of a former railway goods yard at Stratford. The project will cost £4 billion funded from both public and private sources. The site lies to the north of the existing Stratford town centre around Temple Mills. The development totals 13.5 million ft² (1,300,000 m²), including 5 million ft² (460,000 m²) of offices, 1.6 million ft² (150,000 m²) of retail and 4,850 new homes. The retail element will be anchored by three department stores and it is hoped that it will become the third most important retail centre in London after the West End and Knightsbridge shopping districts in the city centre. There will be a cluster of tall buildings including towers of 50 and 30 storeys designed by Richard Rogers.





Stratford City



A package of improvements to Stratford Regional Station is being implemented. These improvements will provide a long-term legacy benefit before the Games, as well as additional temporary measures to meet the specific needs of the Games. This package is part of a larger scheme which includes works related to the Stratford City Development and the proposed Docklands Light Railway extension to Stratford International Station.







The programme of works being developed includes the following elements:



• re-opening the eastern subway with new stairs to platforms 3/5 (westbound Central line and westbound mainline) and 6/8 (eastbound Central and eastbound mainline);

• an additional westbound platform for the Central Line;

• widening the eastern end of platforms 6/8,

• platform extensions and associated network works for platforms 10a, 11 and 12 (mainline);

• improved accessibility and connectivity to, and between, platforms through the provision of additional lifts and staircases;

• a new mezzanine structure to link the Jubilee Line with the proposed Town Centre Link bridge;

• upgraded station domestic power supplies, and increased station command and control facilities;

• de-cluttering of platforms 3/5 and 6/8; and

• a temporary footbridge on platform 6/8, if required.




In addition there are other planned or proposed works being developed by other parties:



Docklands Light Railway will construct two new platforms (12a and 12b) for use by the North London Line. The platforms will be connected to all subways, which will be extended. There will also be a connection between the central and eastern subways;





Stratford Regional - view from Stratford City side



Docklands Light Railway will convert the existing North London Line platforms (1 and 2) for use by the Docklands Light Railway on the Canning Town to Stratford International Station route;



Docklands Light Railway has also upgraded the existing mezzanine level platform to two terminating platforms (4a and 4b) for services to Poplar; and as part of the Stratford City Development a new Northern Ticket Hall will be constructed along with the Town Centre Link Bridge, (also known as the 'Living Bridge'), which will link Stratford town centre with the new Stratford City Development.



The planned works will increase the peak capacity of Stratford Regional Station for existing and new services. The infrastructure works will provide much needed additional capacity, but it will also be essential to develop robust operational plans for each of the modes in order to deliver these essential works.





Stratford Platforms



The transport arrangements for London 2012 will succeed or fail based on the success of the arrangements at Stratford Regional and Stratford International. By 2012 London Underground is expected to be supporting 4M daily passenger journeys (up from 3.3M at present) but during the Olympic period this will increase to 5M passenger journeys a day driven by the Olympic venues, workforce and the Olympic Events each day in Hyde and Victoria Parks which are expected to attract around 65,000 people each day. For Stratford it means handling 120,000 passengers during the 3 hour morning peak, up from 37,000 today. Of these 3 to 4% are expected to be mobility impaired and larger wider lifts will be designed to make access easier.



The London 2012 Olympic Challenge is a huge undertaking but for both the spectators and residents of London the first measure of success will be how well transport arrangements cope with the exceptional demand both of “normal life” and the Olympics, the all night running on the days of the opening and closing ceremonies and the late running to 2.30 am on other nights. How London copes with this exceptional demand whilst maintaining safety and security will be largely gauged from how well the crucial Stratford Hub works.





Aquatic Centre